WEEKLY UPDATES

Week of July 3th-8th

Site 1 (242 Broome Street)

Site 1 will have no street work for the next week. Fit out work for the interior of the residential building from the 3rd floor through the 11th floor is on-going.  There will be no work on Tuesday, July 4th. Work will occur on Saturday, July 8th.
 

Site 2 (115 Delancey Street)

Site 2’s progress will include exterior wall panel delivery and installation throughout the week. Superstructure concrete has begun and will proceed for the next few months.  Concrete pours will be scheduled throughout the week as needed and may occur into the evening hours as permitted. Interior mechanical, electrical and plumbing fit out will continue on the lower floors.  There will be no work on Tuesday, July 4th. Tower Crane #2 removal will begin on Saturday. July 8th and continue until completed as permitted. 

  

Site 5 (145 Clinton Street)

The upcoming week's work at Site 5 includes façade storefront and glass installation ongoing at Broome Street, residential lobby, and Clinton street.  Rebar, formwork, and concrete work on Broome Street park and 3rd floor terrace. Perimeter wall finish framing, insulation, hydronic piping, PTAC sleeve and coil installation, final sheet rocking ongoing from 3rd - 15th floors. Cabinetry installation continues on 8-10th floors, cabinets are being delivered at a floor per week. Window installation for remaining pickup areas ongoing at tower. Façade metal panel installation ongoing on 10th-11th floors, as well as scaffold removal on tower is ongoing from 12th floor down. ConEd interconnection work will begin as well as gas service connections in street. Verizon connections to be complete to street. Elevator installation work continues for freight, service, and passenger elevators.  There will be no work on Tuesday, July 4th. General construction work will occur on Saturday, July 8th from 9am to 5pm.     

 

Site 6 (175 Delancey Street)

The coming week's activity at Site 6 includes storefront installation at the 1st floor Broome and Delancey Street elevations. Interior framing, drywall, mechanical, electrical, and plumbing work continues from the cellar to the 14th floor. Roofing work will continue on the 4th and 5th floor terraces. There will be no work on Tuesday, July 4th. Work will occur on Saturday, July 8th from 9am-5pm.